EMJM DEGREE: Triple Master's Degree - Mechanics of Sustainable Materials and Structures (MS2) (Grant under preparation)
- Planned Duration: 48 months
- Consortium: TU Dortmund (D), Ecole Centrale de Nantes (F), University of Trento (I)
- Principal Investigators: Francesco Dal Corso and Oreste S. Bursi
- Total Funding: € 4,000,000 EURO
LASTTS: Laser cutting technology for tubular structures. (Grant No: 101034038)
- Planned Duration: 48 months
- Consortium: 10 European universities and 5 private companies.
- Principal Investigators: Oreste S. Bursi and Gabriele Zanon
- Total Funding: € 1,764,644 EURO
INSPIRE: Innovative ground interface concepts for structure protection. (Grant No: 813424)
- Planned Duration: 48 months
- Consortium: 8 European universities and 5 private companies.
- Principal Investigators: Oreste S. Bursi and Davide Bigoni
- Total Funding: € 3,892,123 EURO
DISSIPABLE: Fully Dissipative and Easily Repairable Devices for Resilient Buildings with Composite Steel-Concrete Structures. (Grant No: 800699)
- Planned Duration: 36 months
- Consortium: 8 participants.
- Principal Investigators: Nicola Tondini and Oreste S. Bursi
- Total Funding: € 907,405.82 EURO
SERA: Seismology and Earthquake Engineering Research Infrastructure Alliance for Europe. (Grant No: 730900)
- Planned Duration: 36 months
- Consortium: 21 participants.
- Principal Investigator: Oreste S. Bursi
- Total Funding: € 10,000,000 EURO
XP-RESILIENCE: Extreme loading analysis of petrochemical plants and design of metamaterial-based shields for enhanced resilience. (Grant No: 721816)
- Planned Duration: 48 months
- Consortium: 8 European universities and 7 private companies.
- Co-ordinators and PIs: Oreste S. Bursi and Nicola Tondini
- Total Funding: € 3,393,812 EURO
INDUSE-2-SAFETY: Component fragility evaluation, seismic safety assessment and design of petrochemical plants under design-basis and beyond-design-basis accident conditions. (Grant No: RFS-PR-13056)
- Planned Duration: 2013-2016 (36 months)
- Consortium: 9 European universities and industries.
- Co-ordinator and PI: Oreste S. Bursi
- Budget: € 1,713,842 EURO
SEQBRI: Performance-based earthquake engineering analysis of short-medium span steel-concrete composite bridges (Contract RFSR-CT 2012-00032).
- Planned Duration: 2012-2015 (36 months)
- Consortium: 6 European universities and industries.
- Principal Investigator: Oreste S. Bursi.
- Budget: € 1,401,959
SERIES: Seismic Engineering Research Infrastructures for European Synergies (Grant No: 227887, FP7/2007-2003).
- Duration: 2009-2013 (48 months).
- Consortium: 23 European universities and industries
- Principal Investigator: Oreste S. Bursi.
- Total Funding: € 9,723,659
INDUSE: Structural safety of industrial steel tanks, pressure vessels and piping systems under seismic loading (Grant No: RFSR-CT-2009-00022)
- Duration: 2009 – 2012 (36 months)
- Consortium: 8 European universities and industries.
- Principal Investigator: Oreste S. Bursi
- Budget: € 1,790,383